Active Gravel and Sand Pits (Extraction Sites)

• Multibeam Echo Sounding Survey
• Volume Calculation & Map Creation
• Sediment Exploration with Seismic Echo Sounders
• Sludge Assessment
• Sampling and Sediment Core Extraction up to 100m Water Depth
• Gravel/Sand Quality Sampling with Vibratory Coring
• Residual Gravel Assessment
• Concept Development for Washing Sludge Extraction
• Environmental Monitoring



Floating PV Systems / FPV

• Preliminary Waterbody Survey – Echo Sounding
• Acoustic Detection of Aquatic Plants/Macrophytes
• Seismic Sediment Investigation for Anchor Planning
• Lakebed Stability Assessment for Anchor Planning
• Ecological Studies Based on LAWA Recommendations
• Environmental Monitoring



Reservoirs

• Multibeam Echo Sounding Survey
• Volume Calculation & Map Creation
• Sediment Exploration with Seismic Echo Sounders
• Sediment and Sludge Assessment
• Sampling and Sediment Core Extraction up to 100m Water Depth (deeper on request)
• Sediment Stratigraphy
• Lifetime Calculation
• Consultation on Sediment Removal
• Environmental Monitoring



Standing Waters: Lakes – Urban Ponds – Stormwater Retention Basins – Canals – etc.

• Multibeam Echo Sounding Survey
• Volume Calculation & Map Creation
• Sediment Exploration with Seismic Echo Sounders
• Sediment and Sludge Assessment
• Sediment Core Sampling
• Nutrient Analysis (P, N) and Organic Components
• Contaminant Analysis (Heavy Metals, PAHs, etc.) According to LAGA Standards
• Consultation on Waterbody Restoration